doc.arcgis.com/en/imagery/workflows/managing-elevation/workflow/workflow-preparing-inputs.htm

Preview meta tags from the doc.arcgis.com website.

Linked Hostnames

9
  • General Meta Tags

    16
    • title
      Preparing input data—Managing Elevation | Documentation
    • charset
      utf-8
    • X-UA-Compatible
      IE=edge,chrome=1
    • viewport
      width=device-width, user-scalable=no
    • description
      Preparing input data This section will discuss best practices and specifications for preparing your data when using the Managing Elevation workflow. Imagery requirementsThe Managing Elevation workflow is intended to work with specific types of data. The basic data requirements are listed in the table below.ParameterRequirementBit depthRequiredRecommended file format Tiled TIF, LZW compression, with internal tile size 128 or 256 pixels (provides the fastest access and smallest size). Consider converting other formats to tiled TIF to improve efficiency and reduce data volume. Converting LIDAR data to tiled TIF will result in loss of point information. Instead, in ArcGIS, manage LIDAR data using LAS files
  • Link Tags

    6
    • shortcut icon
      /assets/img/favicon.ico
    • stylesheet
      /assets/css/screen.css
    • stylesheet
      /cdn/calcite/css/documentation.css
    • stylesheet
      /assets/css/print.css
    • stylesheet
      /cdn/css/colorbox.css

Links

40